Last updated: 15 March 2024

Next review: 20 October 2024

The council is responsible for carrying out repairs and for administering highway legislation. This includes planned and emergency maintenance, surveys and street works.

Planned maintenance programme

The council’s highway maintenance group is responsible for the maintenance and enforcement of approximately 405 kilometres of highway throughout the borough. They also provide advice on reporting dangerous pavements and what to do in the event of an accident resulting from trip hazards such as holes in the pavement and uneven paving slabs.

The council follows the general standards contained within the DTLR and Local Authority Association codes of practice when delivering its highway maintenance program.

The proposed planned maintenance programme is designed to the highest standard possible to improve the existing carriageways and footways. It is intended to improve the environment for those people living, working or otherwise using the public highways not only visually, but to make the streets safer and more pleasant to use. These programmes are flexible enough to complement other initiatives with funding from Visual Amenity, Single Regeneration Budget, or Area Improvement Initiative. Highway Maintenance Schemes will be co-ordinated to produce a standard defined by Best Value or better. The specification will continue to be revised to achieve the highest possible standard.

The following items have been taken into account to ‘tune’ the priority list:

  • Areas where accidents have occurred
  • Co-ordination with Traffic Management schemes such as Controlled Parking Zones, traffic calming measures, environmental schemes etc.
  • Borough wide priority and special areas
  • Co-ordination with the Street Lighting Programme, Sites reported by Council members and Complaints received from public.

Our aims

  • To inspect all roads and footways regularly to make sure they are maintained to a safe standard. The items inspected include condition of footway, carriageway, white lining, guard-railing, street nameplates, street lighting, street signs, highway drainage, street trees and grass verges
  • To conduct condition and assessment surveys annually. The information gathered is used to prepare planned renewal programmes, which are published on the Council web site
  • To deal with issues and take enforcement action against offenders that use and abuse the highway (e.g. overhanging vegetation and building materials)
  • To issue licences for skips, scaffolding, hoardings, building materials and street works, along with applications for vehicle crossovers. The target time-scale for issuing licences is 3 working days
  • To inspect the work of other companies (providing services such as gas, electricity, water, telephone and cable TV) to ensure that road and footway reinstatements are carried out to high national standards of safety and quality
  • To respond to reports of damaged or faulty roads, trees and footways, and take appropriate action as quickly as possible

Planned highway maintenance programme for 2024/25

All data is subject to change and every effort will be made to ensure that the information provided is as accurate as possible. The information will be updated regularly.

Highways Maintenance Programme 2024/25

Additional Resurfacing

This programme has been made possible by reallocated HS2 funding

Additional Resurfacing Information

Structural maintenance

The structural maintenance program encompasses large scale refurbishment works on the carriageways and footways, and council structures.

Street Lighting maintenance

We have a schedule to maintain streetlights on public roads. You can report problems with illuminated bollards, illuminated signs, pedestrian crossing flashing beacons and streetlights, using the button at the top of the page. You should provide detailed information about the location and, if possible, the lamp column number.

Carriageway overlay

Carriageway overlays are designed to improve riding quality of a road by the application of a thin layer of material to the carriageway surface.

Carriageway slurry sealing

Slurry sealing is an economical method of sealing carriageways against the penetration of water and improving skid resistance.

Large area footway programme (LAFP)

The large area footway patching programme encompasses the refurbishment of the borough road footways that are considered to be in a poor condition and includes the conversion of defective stone footways to bituminous material.

Visual amenity (environmental enhancement)

Visual amenity schemes are designed to improve visual appearance and ease of maintenance of our streets. They include replacement works and modernisation of planter bays, guard railing and benches.